カザフスタン向けジブクレーン出荷の準備方法

A wall-mounted jib crane leaves our yard this week, bound for a machinery repair workshop in Kazakhstan. Before it reaches the container, the order passes through inspection, packing, and document checks. This article shows that sequence, part by part. Featured Snippet: This Hanko jib crane order for Kazakhstan moved through a fixed pre-shipment sequence. The arm and wall bracket were measured against the order drawing. Welds, paint, and hardware were checked and counted. Parts were then packed, listed, and loaded with a complete document set. The Order Behind This Shipment The customer runs a repair workshop in Kazakhstan. Crews there service heavy machinery and need lifting points at fixed […]
掘削機用カスタム旋回ギアボックスがペルーへ出荷されました

On October 28, 2026, Hanko loaded and shipped a batch of custom swing gearboxes to Peru. The order passed final quality inspection on October 24. Every unit was containerized for a construction machinery trader in Lima. Featured Snippet: A swing gearbox is a vertical planetary slewing reducer for excavators and crawler cranes. It mounts between the hydraulic swing motor and the machine platform. The splined output pinion meshes directly with the slewing ring, delivering 360° rotation at low speed and high torque. The Shipment to Peru The containers left the factory on October 28 and are on their way to the port of Callao. The customer rebuilds and services excavators […]